HS Listing ID-63562
.48 acres
– Express exterior and extended prep with tail drive
– 90 ft conveyer tunnel- 70 foot enclosed
– Two vacuums
– Redid asphalt and concrete space up to four vacuums
– Two employees full time
– Three part time
– 50 members
– Opened in August 2024
– Closed for a year and a half
– 30-40 cars a day
– Four year old equipment
– Tunnel master junior controller
– Put 100k into property face lift all new signage and paint
A SIGNED CONFIDENTIALITY AGREEMENT IS REQUIRED FOR THE EXACT LOCATION